What does an electrical switchboard upgrade involve?

An electrical switchboard upgrade replaces the old protection in your main switchboard- ceramic fuses, dated breakers, sometimes the backing panel itself- with modern circuit breakers and RCD safety switches on every circuit. 

Your electrical switchboard is where Evoenergy’s supply meets your wiring; everything in the house runs through it. Here’s the practical difference: a fuse protects the cable, but an RCD switchboard protects the person touching the appliance. Fuses can’t do that. It’s why the switchboard upgrades Canberra homes get today look nothing like the boards they replace.

Repair, replace, or full upgrade?

Not every board needs the full job. Most switchboard upgrades Canberra callers ask about land in one of three buckets, and we’ll tell you straight which one yours is.

Switchboard repairs

A failed breaker, a loose neutral, heat damage on one circuit. Switchboard repairs suit boards that are fundamentally sound, where one component has let go. We repair what's worth repairing, and say so when it isn't.

Partial replacement

Fuses out, circuit breakers and safety switches in, on a board that's otherwise workable. It's the most common residential switchboard upgrade in 80s and 90s Canberra homes, worthwhile only if the panel isn't asbestos-backed and there's room to work.

Full upgrade

A complete new switchboard installation: new enclosure, main switch, RCBOs on every circuit, spare ways for solar or a charger later. A 3-phase switchboard upgrade or commercial switchboard rebuild sits here too, bigger loads, planned properly.

Not sure whether it's a repair or a rebuild?

Send us a photo of your board. We’ll tell you whether it’s a repair or a rebuild, and what drives switchboard upgrade cost either way: board condition, circuit count, asbestos. Straight answer, no-obligation quote

How do I know my switchboard needs upgrading?

If you’re searching “is my switchboard safe” or “do I need to upgrade my switchboard” late at night, the board has usually already answered. Look for ceramic fuses, no safety switches, breakers that trip when the heater and kettle run together, a warm smell at the board, or lights that dip when big appliances start. 

An asbestos switchboard, the black or dark-grey backing panel common in Canberra homes built before the mid-1980s, is reason enough on its own. The switchboard upgrades Canberra homeowners in the older suburbs call us for start here: ex-govvies still on original gear.

Do you need 3-phase power, or is single-phase enough?

Most homes run fine on single-phase. The single-phase vs 3-phase switchboard question comes up when loads stack: ducted reverse-cycle, a workshop, or an EV charger switchboard upgrade where you want faster charging than single phase can deliver. 

Three-phase splits demand across three supply lines, so heavy gear runs without dimming the rest of the house. A 3-phase switchboard upgrade also means a supply application through Evoenergy; we handle that paperwork. It’s why a fair share of the switchboard upgrades Canberra businesses book with us are three-phase switchboard jobs.

Give us a call

0440 138 246 for immediate emergency support.

What happens on the day of a switchboard upgrade?

Here’s how the switchboard upgrades Canberra clients book with us actually run on the day.

1

Isolate and confirm dead

We book the outage window with you in advance, isolate the supply, and confirm dead before anything comes off the wall. Most homes are off for four to six hours.

2

Old board out

If the backing panel is asbestos, a licensed removalist takes it; in the ACT that's the law, no small-job exemption. We coordinate them so you're not chasing two trades.

3

New board in

The new switchboard installation goes in: enclosure, main switch, RCBOs on every circuit, clear labelling, and spare ways for solar or a charger down the track.

4

Test, energise, certify

We test every circuit before energising, then lodge the Certificate of Electrical Safety with Access Canberra within 14 days. You keep a copy for insurance and resale.

Our commitment to quality and customer satisfaction speaks for itself.

Our Testimonials

. Here’s what our clients have to say about their experience with our trusted and reliable services.

Frequently asked questions about Switchboard Upgrades

Usually, yes. You can't safely mount modern gear on an asbestos panel, and drilling into it releases fibres. In the ACT, only a licensed asbestos removalist can remove it; there's no small-quantity exemption like NSW has. We coordinate the removalist as part of the job, so the panel goes out safely, and the new board goes straight in.

Yes. We lodge a Certificate of Electrical Safety (CES) with Access Canberra within 14 days of the work, and you keep a copy. On a full board replacement, the new board also has to meet AS/NZS 61439 and Evoenergy's Service and Installation Rules before it's energised. Hold onto the CES; insurers and buyers ask for it.

Often, but not always. A switchboard upgrade for solar is needed when the board has no spare ways for the solar supply main switch, no RCD protection, or an asbestos panel the installer won't touch. We check the board before the solar quote is locked in, so you're not paying for two visits.

Sometimes. If the board is sound, swapping ceramic fuses for breakers and adding a switchboard safety switch is a legitimate middle step. But if the panel is asbestos, the wiring around it has deteriorated, or there's no physical room, patching it means paying twice. We'll tell you which yours is before any work starts.

Most residential jobs take a day, with power off for roughly four to six hours in the middle of it. Bigger boards, three-phase work, or asbestos removal can stretch that. We confirm the outage window before we start, so fridges, freezers and anyone working from home can plan around it.

In most houses they're the same thing. Strictly, your electrical switchboard, the main switchboard, is where the supply enters, and the main switch sits, while a distribution board is a secondary board fed from it, common in larger homes, granny flats and commercial buildings. The switchboard vs distribution board question mostly matters when planning circuits for extensions.