EV Charger Installation

Licensed & Trusted Electricians for Safe and Efficient Repairs

EV Charger Installation Canberra

Your charger is only as good as the circuit behind it. Get the switchboard and supply right, and the charger takes care of itself; that’s the work most people never see.

Rated 5 stars (100+ Reviews)

Request A Quote Today

Some Of The Brands We Work With

What Does EV Charger Installation in Canberra Involve?

Every EV charger installation starts with one question: what can your switchboard actually support? That determines charger size, circuit type, and whether you need a supply upgrade before anything gets mounted.

Most Canberra homes on single-phase power suit a 7kW Level 2 charger. Dedicated 32-amp circuit, full overnight charge, no supply upgrade needed. Commercial setups with fleet bays or shared car parks typically need 22kW three-phase units. Faster charging, but the switchboard and incoming supply have to handle it.

Then there’s mounting. Outdoor installs need IP-rated enclosures and UV-stable cabling. A garage or carport run is simpler but still needs a dedicated circuit back to the board.

Why Use a Licensed Electrician for EV Charger Installation?

Load Calculations That Protect Your Board

A 7kW charger pulls 32 amps continuously. Without a proper load assessment, that's enough to trip a single-phase board already running near capacity.

Evoenergy Approval and Network Compliance

Any hardwired EV charger in the ACT needs distributor approval before it's energised. That means load verification, supply checks, and sign-off from Evoenergy.

Wired to AS/NZS 3000

Every circuit gets its own RCD protection and correctly rated cabling. ACT regulations require it for any hardwired charger; it's not a nice-to-have.

Dedicated Circuit, Faster Charge

Most home power points run at 10 amps, around 2kW. A dedicated 7kW or 22kW circuit cuts a full charge from days to hours.

Smart Meter and Off-Peak Tariff Setup

Canberra's time-of-use tariffs make overnight charging significantly cheaper than peak rates. The right charger configuration schedules draws automatically, no manual switching, no thinking about it at 11 pm.

Solar-to-EV Charging

Without a dedicated EV circuit, excess solar generation is exported back to ActewAGL at a low feed-in rate. Routed correctly, that same generation charges the car first. It's a wiring decision, not a solar one.

Not Sure Your Switchboard Can Handle an EV Charger?

A site assessment tells you whether your board and supply can handle the charger and where it should be mounted. No-obligation quote, upfront pricing.

Home and Commercial EV Charger Installation in Canberra

Most home installs go in a garage, with a wall-mounted 7kW unit on a dedicated 32-amp circuit. Carport and driveway runs need weatherproof enclosures and UV-rated cabling, but follow the same wiring logic. A dedicated circuit isn’t optional; sharing a 7kW charger’s continuous draw with existing power points is how cables overheat behind walls. The average ACT driver covers around 38km a day; a 7kW charger replaces that in two hours overnight. With rooftop solar, shifting the charge window to midday peak generation turns excess export into kilometres instead of feed-in credits.

Commercial and fleet jobs scale differently. Ten cars charging at once will flatten a building’s supply; that’s where multi-port AC units with load management come in. For hospitality and public-access sites, payment-enabled chargers turn parking bays into revenue. Fleet depots with high turnover often need 22kW three-phase AC or DC fast charging, heavier switchboard infrastructure and Evoenergy coordination.

EV Charger Installation Process in Canberra

How We Install Your EV Charger

Most residential jobs are completed in a single visit. Commercial installs may need a separate site assessment first.

Site Assessment

We check your switchboard, supply type, and cable run to the charger location. If the board or supply needs work, that gets scoped before the install starts.

Circuit and Charger Install

Dedicated circuit from your board to the mounting point, charger fitted and wired in. Outdoor locations get IP-rated enclosures and UV-stable cable protection.

Testing and Handover

Full circuit testing before the charger's energisation, insulation resistance, earth path, and RCD trip times were all confirmed. Compliance certificate issued and unit settings walked through.

Trusted & Proven

Here's How We're Tracking

EV Systems Installed
0 +
Brands Serviced
0 +
Trained Members
0 +
Our commitment to quality and customer satisfaction speaks for itself.

Our Testimonials

. Here’s what our clients have to say about their experience with our trusted and reliable services.

Request Service Today

Your Questions. Our Answers

EV Charger Installation in Canberra: FAQs

Most residential installs sit between $1,500 and $3,500 depending on the job. A short cable run in a garage with a modern switchboard lands at the lower end. Older homes needing board upgrades or longer runs from the switchboard push the price up. Commercial multi-port setups are a different scope entirely; we quote after a site assessment, so the number reflects your actual install.

We install most major brands available in Australia, Fronius, ABB, Tesla Wall Connector, and others depending on the job. The right unit depends on your property; some integrate with existing solar inverters, others are built for commercial multi-port load management. The recommendation comes down to your switchboard, supply type, and how the car's actually used, not a preferred supplier list.

Yes. The ACT's Sustainable Household Scheme offers zero-interest loans for eligible homeowners, and EV charger installation is a covered category. The loan covers both the unit and the electrical work. You apply through the scheme, and once approved, payment goes directly to the installer. We handle scheme jobs regularly and can walk you through the process.

Technically yes. A standard 10-amp GPO delivers around 2kW; most EVs will take 30-plus hours to reach a full charge at that rate. The bigger issue is that a general power circuit isn't designed to run at capacity continuously. Heat builds in the cabling and connections over time. AS/NZS 3000 requires a dedicated 32-amp circuit for EV charging loads for exactly that reason, and it drops charge time from days to hours.

Most homes don't. A single-phase 7kW charger handles the average ACT driver comfortably, 38km a day replaced in about two hours overnight. Three-phase only comes into play at 22kW, which suits commercial or fleet setups more than residential. Upgrading means Evoenergy involvement and additional switchboard work. Worth confirming you actually need that speed before committing.